Hydrogeology & Hydrology Program Navigation buttons
Southern Maryland Project contact: David Drummond, Project chief (drummond@mgs.md.gov)

 

Drill Site at Paw Paw Hollow

Leonardtown, Maryland

A 24-hour pump test was conducted with a discharge of 70 gallons per minute (gpm), immediately followed by a 24-hour recovery test. Based on the results of those tests, the specific capacity of the well was determined to be 2.45 gpm/foot. The transmissivity of the aquifer was determined to be 22,000 gpd/ft (3,000 ft2/day) from the drawdown test, and 40,000 gpd/ft (5,400 ft2/day) from the recovery test. Total drawdown was 28.53 feet.

Aquifer intervals:

0-50 feet, Surficial Lowland Deposits
50-240 feet, Chesapeake Group
240-430 feet, Piney Point Formation
430-437 feet, Marlboro Clay
437-580 feet, Aquia Formation
580-590 feet, Brightseat Formation
590-1150 feet, Upper part of Patapsco Formation
1150-1550 feet, Lower part of Patapsco Formation
1550-1650 feet, Arundel Formation (?)

Please note that the information on this page is based on preliminary data, and hence subject to change.

For more information on field methods, please see the Data Collection section.

 


updated
8/6/01


| Return to previous page | Go to the Hydro Home Page |
Jump to Hydrology Home Page Return